July 2024-ah Hortoki station hawn tum
Governor Dr Hari Babu Kambhampati chuan nimin khan Raj Bhavan-ah Northeast Frontier Railway (NFR) engineer-te a kâwm a, Bairabi-Sairang inkar rél kawng, New Line Project (km 51.38)-a hmalak tawhte an thlirho. Hortoki rel chawlhhmun chu tun July thlaah hawn tum a nih thu tarlan a ni.
Governor chuan, Mizoram hmasawnna atan transportation ṭha a pawimawh thu sawiin, "Rel hian Mizoram leh a ṭhenawm state (Assam) inkara zin hun a tihtlem bakah, passenger leh bungraw phurh senso nasa takin a titlem dawn," a ti a; rêlin a ken tel sumdawnna lian tham tak tak awm tur atan lo inpuahchah ṭha turin Mizorama kutkawih eizawnna buaipuitute a chah.
NFR chief engineer (construction) Vinod Kumar leh deputy chief engineer Harjimal Meena ten hnathawh tawh chinte an tarlang a; rel kawng siamna bungruate la bo lo turin mipui an ngen bawk.
BAIRABI-SAIRANG REL KAWNG
- Project senso ennawn a nih hnuah cheng vbc. 8,213.72 a ni.
- Hna thawh tur zinga 93% zawh a ni tawh.
- Rel chawlhhmun pali - Hortoki, Kawnpui, Mualkhang leh Sairang te a awm.
- Bairabi-Sairang inkar rel kawng km. 51.38 chu section pali - Bairabi-Hortoki, Hortoki-Kawnpui, Kawnpui-Mualkhang leh Mualkhang-Sairangah ṭhen a ni.
- Bairabi-Hortoki section-ah rel tlantir chhin a ni tawh.
- 2024 chhungin Hortoki-Kawnpui leh Kawnpui-Mualkhang section-ahte rêl tlantir chhin tum a ni.
- July 2024 chhungin Sairang Terminal Station hawn tum a ni.